Configuration and location of LEVTEAU systems
Last update :
Go directly to EGSE#1, EGSE#2,EGSE#3,EGSE#4,EGSE#5,EGSE#6,EGSE#7,EGSE#8,EGSE#9,EGSE#10,EGSE#11.
cliquez ici pour la version française
MICRO : 80537 software revision located on the AS16 board, (27C512)
AS16 : FPGA revision embedded on the AS16 board , designed for AS16 management (XC17256E)
BS2 : FPGA revision embedded on the CK-PROT board, designed for DPU synchro lines and BS2-like lines (XC17256E)
CS16 : FPGA revision embedded on the CS16 board, designed for CS16 and HLC management (XC17256E)
28V : power supply for HLC lines
3.3V : power supply for DPU (give-up)
Others : à suivre
Only one change by line. If a field is empty, no change occured, since previous line
The LEVTEAU current user manual revision is available here.
Available at Meudon
|
|||||||||
Date |
Place
|
MICRO
|
AS16
|
BS2
|
CS16
|
28V
|
3.3V
|
Others
|
Correction and /or modification
|
---|---|---|---|---|---|---|---|---|---|
16-08-2004
|
Munich-ASTRIUM
|
|
|
|
|
|
|
|
COR-NC-17fixed. |
05-07-2004
|
ESTEC-Noodjwick
|
|
|
|
|
|
|
COR-NC-16 fixed. Conformity BS2-DPU electrical output and identical firmware of EGSE#3 installed. Ex-DPU power connector replaced by RTC connector | |
14-04-2003 |
Munich-ASTRIUM
|
All SBDL inputs (DBLA and AS16) are fitted with a R=120ohms serial with C=100pF between differential inputs | |||||||
05-03-2003
|
Munich-ASTRIUM
|
Latching the AS16 data's is done on the falling edge of the AS16 clock since 800nS later
|
|||||||
05-08-2002
|
ESTEC-Noodjwick
|
no
|
no
|
no
|
Meudon development and reference model, available at Meudon
|
|||||||||
Date |
Place
|
MICRO
|
AS16
|
BS2
|
CS16
|
28V
|
|
Others
|
Correction and /or modification
|
---|---|---|---|---|---|---|---|---|---|
01-03-2006
|
|
|
|
|
|
|
|
Extra CS16-32S pulse bug fixed. | |
22-12-2004
|
|
|
|
|
|
|
|
|
HLC Connector conformity & CS16 board R10, 12, 14 & 16 // 1.2 kOhms |
17-12-2004
|
|
|
|
|
|
|
|
LLC polarity conformity | |
29-10-2004
|
|
|
Conformity BS2-DPU electrical output. | ||||||
09-06-2004
|
CS16-32S final implementation | ||||||||
02-02-2004 | Synchro bug + RTC polarity corrections + CS16-32S implementation | ||||||||
09-10-2003
|
|
|
|
|
|
|
|
Inter-racks Synchro implementation | |
27-03-2003
|
|
|
|
|
yes
|
|
|
Bug corrected for CS16 unary command. Wiring of the 30V (28V) for HLC.
|
|
06-03-2003
|
Meudon-LAM135
|
no
|
|
CPU inproved with individual AS16 and CS16 TC. Check-sum error is now detected
|
???
|
|||||||||
Date |
Place
|
MICRO
|
AS16
|
BS2
|
CS16
|
28V
|
|
Others
|
Correction and /or modification
|
---|---|---|---|---|---|---|---|---|---|
03-01-2006
|
Meudon
|
|
|
|
|
|
|
|
Tantalium capacitor explosion : fixed !!! |
15-03-2005
|
CNES Toulouse
|
|
|
|
|
|
|
|
HLC Connector conformity |
11-02-2005
|
Meudon
|
|
yes
|
|
|
Again full configuration designed for CNES training CS16 board R10, 12, 14 & 16 // 1.2 kOhms LLC polarity conformity |
|||
06-07-2004
|
ESA-Estec
|
|
|
|
no
|
no
|
|
|
Conformity BS2-DPU electrical output. Removal of 28V power supply and CS16 board for EGSE#1 compliance. |
19-09-2003
|
Munich-ASTRIUM
|
|
|
|
|
|
|
|
Delivery to ASTRIUM Munich instead of ESTEC-RSSD |
11-09-2003
|
Meudon
|
yes
|
|
|
Ready to deliver to RSSD
|
Available at Meudon
|
|||||||||
Date |
Place
|
MICRO
|
AS16
|
BS2
|
CS16
|
28V
|
|
Others
|
Correction and /or modification
|
---|---|---|---|---|---|---|---|---|---|
22-12-2004
|
|
|
|
|
|
|
|
|
HLC Connector conformity |
21-12-2004
|
|
|
|
|
|
|
LLC polarity conformity, CS16-32S final implementation, Synchro bug, RTC polarity corrections, Conformity BS2-DPU electrical output, CS16 board R10, 12, 14 & 16 // 1.2 kOhms | ||
09-10-2003
|
Meudon
|
yes
|
|
|
Inter-racks synchro implementation
|
Available at Meudon
|
|||||||||
Date |
Place
|
MICRO
|
AS16
|
BS2
|
CS16
|
28V
|
|
Others
|
Correction and /or modification
|
---|---|---|---|---|---|---|---|---|---|
22-12-2004
|
|
|
|
|
|
|
|
|
Conformity BS2-DPU electrical output. |
21-12-2004
|
|
|
|
|
|
|
|
LLC polarity conformity, | |
13-07-2004
|
|
|
|
|
|
|
|
|
HLC Connector conformity & CS16 board R10, 12, 14 & 16 // 1.2 kOhms |
11-06-2004
|
COROT clean room
|
Instrument integration
|
|||||||
09-06-2004
|
CS16-32S final implementation
|
||||||||
27-02-2004
|
Backplane extension and extra Dispatcheur board | ||||||||
02-02-2004
|
Synchro bug + RTC polarity corrections | ||||||||
07-01-2004
|
Meudon
|
yes
|
|
|
MIQ Case test at ISO building in Clean Room
|
|||||||||
Date |
Place
|
MICRO
|
AS16
|
BS2
|
CS16
|
28V
|
|
Others
|
Correction and /or modification
|
---|---|---|---|---|---|---|---|---|---|
01-03-2006
|
|
|
|
|
|
|
|
Extra CS16-32S pulse bug fixed.
|
|
21-12-2004
|
|
|
|
|
|
|
|
LLC polarity conformity, | |
13-07-2004
|
COROT clean room
|
HLC Connector conformity & CS16 board R10, 12, 14 & 16 // 1.2 kOhms | |||||||
08-07-2004
|
|
|
|
|
|
|
|
|
Conformity BS2-DPU electrical output. |
09-06-2004
|
CS16-32S final implementation
|
||||||||
27-02-2004
|
Backplane extension and extra Dispatcheur board | ||||||||
02-02-2004
|
Synchro bug + RTC polarity corrections | ||||||||
07-01-2004
|
Meudon
|
yes
|
|
|
Available at Meudon
|
|||||||||
Date |
Place
|
MICRO
|
AS16
|
BS2
|
CS16
|
28V
|
|
Others
|
Correction and /or modification
|
---|---|---|---|---|---|---|---|---|---|
22-12-2004
|
|
|
|
|
|
|
|
|
HLC Connector conformity & CS16 board R10, 12, 14 & 16 // 1.2 kOhms |
21-12-2004
|
|
|
|
|
|
|
|
LLC polarity conformity, | |
09-07-2004
|
|
|
|
|
|
|
|
|
Conformity BS2-DPU electrical output. |
09-06-2004
|
CS16-32S final implementation
|
||||||||
27-02-2004 | Backplane extension and extra Dispatcheur board | ||||||||
03-02-2004
|
Synchro bug + RTC polarity corrections | ||||||||
14-01-2004
|
Meudon
|
yes
|
|
EGSE BNR Tests
|
|||||||||
Date |
Place
|
MICRO
|
AS16
|
BS2
|
CS16
|
28V
|
|
Others
|
Correction and /or modification
|
---|---|---|---|---|---|---|---|---|---|
01-03-2006
|
|
|
|
|
|
|
|
Extra CS16-32S pulse bug fixed.
|
|
22-12-2004
|
|
|
|
|
|
|
|
LLC polarity conformity, HLC Connector conformity & CS16 board R10, 12, 14 & 16 // 1.2 kOhms | |
07-07-2004
|
|
|
|
|
|
|
|
|
Conformity BS2-DPU electrical output. |
09-06-2004
|
CS16-32S final implementation
|
||||||||
02-02-2004
|
Synchro bug + RTC polarity corrections | ||||||||
14-01-2004
|
Meudon
|
yes
|
|
Toulouse CMC
|
|||||||||
Date |
Place
|
MICRO
|
AS16
|
BS2
|
CS16
|
28V
|
|
Others
|
Correction and /or modification
|
---|---|---|---|---|---|---|---|---|---|
20-12-2004
|
|
|
|
|
|
|
|
|
HLC Connector conformity |
17-12-2004
|
|
|
|
|
|
|
|
LLC polarity conformity | |
10-12-2004
|
Meudon - LAM135
|
CS16 board R10, 12, 14 & 16 // 1.2 kOhms | |||||||
07-07-2004
|
|
|
|
|
|
|
|
|
Conformity BS2-DPU electrical output. |
09-06-2004
|
CS16-32S final implementation
|
||||||||
03-02-2004
|
Synchro bug + RTC polarity corrections | ||||||||
15-01-2004
|
Meudon
|
yes
|
|
Toulouse CMC
|
|||||||||
Date |
Place
|
MICRO
|
AS16
|
BS2
|
CS16
|
28V
|
|
Others
|
Correction and /or modification
|
---|---|---|---|---|---|---|---|---|---|
20-12-2004
|
|
|
|
|
|
|
|
|
HLC Connector conformity |
17-12-2004
|
|
|
|
|
|
|
|
LLC polarity conformity | |
10-12-2004
|
Meudon - LAM135
|
CS16 board R10, 12, 14 & 16 // 1.2 kOhms | |||||||
13-07-2004
|
|
|
|
|
|
|
|
|
Conformity BS2-DPU electrical output. |
13-07-2004
|
|
|
|
|
|
|
|
CS16-32S final implementation | |
01-04-2004
|
Meudon ISO
|
CS16-32S Implementation | |||||||
02-02-2004
|
Synchro bug + RTC polarity corrections | ||||||||
15-01-2004
|
Meudon
|
yes
|
|
Bertrand Le Ruyet tests.
|
|||||||||
Date |
Place
|
MICRO
|
AS16
|
BS2
|
CS16
|
28V
|
|
Others
|
Correction and /or modification
|
---|---|---|---|---|---|---|---|---|---|
22-12-2004
|
|
|
|
|
|
|
|
|
HLC Connector conformity & CS16 board R10, 12, 14 & 16 // 1.2 kOhms |
21-12-2004
|
|
|
|
|
|
|
|
LLC polarity conformity, CS16-32S final implementation, | |
02-02-2004
|
Synchro bug + RTC polarity corrections | ||||||||
15-01-2004
|
Meudon- LAM 006
|
yes
|
|
If you need to be advised when change occur on this page please contact the site administrator
In case of error or mistake on this page please contact the site administrator